Home Shopping 20pcs 22uF 450V Axial Electrolytic Polarized Capacitors with Long Leads Electronic component Tube Amplifier

20pcs 22uF 450V Axial Electrolytic Polarized Capacitors with Long Leads Electronic component Tube Amplifier

0


Price: $12.88
(as of Oct 04,2022 06:45:48 UTC – Details)



Specifications:
Working Voltage: DC 450V
Surge voltage: DC 500V
Value: 22uf
Capacitance Tolerance: ±20%
Operating temperature: 105℃
Dissipation Factor: <0.24 at 20℃/120Hz
Dimensions: Approx. 21 x 13mm / 0.83 x 0.51in
Lead type length: Tin plating copper layer
Lead length: 27mm / 1.1inch
Type: Polarized
Quantity: 20pcs
Weight: Approx. 79g

Package Included:
20 x Electrolytic Capacitor
【Product Name】—-Electrolytic Capacitor
【Convenient to use】—-Each capacitors is marked on its surface
【Main Feature】Capacitance Tolerance: ±20%;Dissipation Factor: <0.24 at 20℃/120Hz;Operating temperature:105℃
【Multi-function】Heat resisting, low leakage, low loss and low impedance
Suitable for a wide range of electronic applications

LEAVE A REPLY

Please enter your comment!
Please enter your name here